Logistics 7 min reading

What is Warehouse?

Warehouse is the storage that occurs when a transported cargo is kept in a port, warehouse, customs area or similar areas for longer than the specified time…

What is Warehouse?

What Does Warehouse Mean?

Warehouse is the waiting and storage fee incurred as a result of a cargo remaining in a port, warehouse, terminal, bonded area or similar storage area for longer than the specified period. A free usage period may be granted after the cargo enters the relevant site. If the cargo is not withdrawn or the necessary procedures are not completed within this period, the storage fee begins to accrue.

Storage costs mostly occur due to reasons such as prolonged customs procedures, incomplete preparation of documents, failure to organize the transportation vehicle on time, or the buyer not receiving the cargo. Therefore, storage is not just a fee for the use of storage space. It is one of the cost-reflecting consequences of delays in import, export, customs and transportation processes.

Accurately tracking the time the cargo stays on site is important to keep storage costs under control. Particularly in companies that carry out many import or export operations at the same time, cargo entry dates, free periods, document statuses and vehicle plans may be confused. Logistics programs can help centrally track this information and identify cargo at risk of storage earlier.

Storage does not only occur in ports. Similar fees may occur in bonded warehouses, air cargo terminals, temporary storage areas and free zones, depending on the waiting time of the cargo. Tariff applied; It may vary depending on the rules of the facility, the characteristics of the load and the storage area used.

How is Storage Fee Calculated?

When calculating the storage fee, the time the cargo stays on site, the area it covers, its weight, type and the tariff of the facility where it is located are evaluated together. Port, warehouse or terminal operators apply their own fee schedules. These tariffs may explain the date from which the cargo will be charged, how the daily price will be determined, and in which periods the fee will increase.

Charging usually starts after the free waiting period ends. For example, if a certain number of free days are granted for a load, there may be no storage for the load removed from the field within this period. If the load continues to remain on site after the free period ends, the fee will be calculated according to the relevant tariff for each day in excess.

The type of load also affects the calculation. Different pricing methods may be applied for containerized, palletized, bulk or project loads. Higher prices may occur for hazardous materials, cold chain products and cargo requiring special storage conditions. This is because these loads require additional safety, energy, equipment or controlled space.

In some facilities, fees may increase gradually as the waiting time increases. The daily fee, which is lower in the first days, may switch to a higher tariff in the following periods. For this reason, it should be taken into consideration not only how many days of delay there are, but also in which charging period the load falls. Examining the current tariff before the operation allows a more accurate estimate of the cost that may occur.

How Many Days is the Storage Period?

There is no single number of days valid for the storage period in every port, warehouse or terminal. The free waiting period may vary depending on the application of the facility where the cargo is located, the type of transportation, the characteristics of the product and the commercial agreements made. For this reason, the current tariff and free period conditions of the relevant enterprise should be checked before the cargo enters the site.

The start date of the period may also vary depending on the type of operation. In some cases, the date on which the cargo was unloaded from the ship or aircraft, and in some cases, the date on which it was recorded in the terminal or warehouse records may be taken as basis. Incorrect evaluation of the start date may cause the company to realize late that there will be a backlog.

It should also be checked whether the free period covers weekends and public holidays. Calculation can be made on calendar days or business days, depending on the facility application. Even if the customs procedures are completed, if the vehicle cannot be organized on time, the storage period may be extended as the cargo will continue to remain on site.

For this reason, storage time should not be considered merely as historical information, but as an operational limit that must be actively followed. The date of entry of the cargo, the end of the free period, the status of the documents, customs procedures and the vehicle plan should be monitored together. If this information is kept separately in different departments, the risk of delay may increase.

Who Pays for Storage?

Which party will bear the storage expense is determined according to the conditions of transportation, commercial contract, delivery method and the reason for the delay. In import transactions, if the buyer is responsible for not picking up the cargo on time, the cost can often be passed on to the buyer. However, it cannot be said that the storage fee will be automatically paid by the buyer in all cases.

In cases where the documents are sent late by the seller, the carrier does not comply with the operation plan, or the logistics service provider delays the vehicle organization, the responsibility may belong to a different party. For this reason, when determining to whom the storage cost will be reflected, it should be taken into account not only on whose behalf the cargo is coming, but also at what stage and for what reason the delay occurs.

Delivery methods used in international trade help determine the limits of cost sharing. However, the delivery method alone may not explain every detail. Clearly defining costs such as storage, terminal services and additional waiting expenses in the contract reduces disputes that may arise between the parties later.

Before the operation begins, it should be clarified who will monitor the free period, which party will organize the load towing, and how the cost will be shared in case of delay. Otherwise, the fee may continue to increase while the load is waiting on site and the parties may disagree about cost responsibility.

What Happens If the Storage Period is Exceeded?

Once the free waiting period is exceeded, a daily storage fee begins to accrue for the load. As long as the load remains on site, the fee continues to increase. If the tariff is gradual, the daily cost may increase as the waiting time increases. Therefore, even a delay of a few days can create a significant cost depending on the type of cargo and the area it covers.

Exceeding the period will not only result in a storage invoice. Keeping the cargo on site for a long time also affects the use of space in the terminal or warehouse. The business may request that the cargo be moved to a different area, in which case handling, transfer or additional storage fees may occur. For products that require cold chain or special storage, energy and control expenses may also be added to the total cost.

The risk of damage, deterioration or loss of commercial value may also increase in cargoes that have been waiting for a long time. In addition, failure to deliver the cargo to the customer on time may result in disruption of the production plan or loss of sales. For this reason, exceeding the storage period should be considered not only as a logistics expense but also as an operational problem that affects other stages of the supply chain.

In order to reduce the risk of storage, documents must be prepared before the arrival of the cargo, customs procedures must be followed closely and the vehicle that will remove the cargo from the site must be planned in advance. Monitoring free periods, document statuses and delivery schedules through logistics programs can contribute to earlier detection of delays. In this way, necessary intervention can be made before the load remains on site and increasing storage costs can be prevented.